Video language practice.
One film at a time.
Bring a video you enjoy and matching subtitles. Listen to a line, say it yourself, and keep a record of each full pass.
iPhone · iPad · Mac · Android · offline learning · no account
Sentence looping
Choose a subtitle line and use the sentence-repeat control to practise it.
Record and listen back
Hear the original, say it, hear yourself back — both waveforms side by side.
Complete-pass records
Counts actual playback coverage. Sentence drills have their own records.
A hundred squares
One per lap, shaded by the stage you were in. Watching it fill up is the reward.
Bilingual subtitles
Every line, in two languages.
Compare the two subtitle tracks on the video timeline. If files come from different cuts, check the beginning and a later scene and adjust the timing.
- Target and native language, one above the other
- Nudge the timing in 0.1s steps when a file is off
- Fix a wrong line and it stays fixed
Stage four · drilling
Loop one line until it is yours.
The whole method turns on this screen. Mark the lines you couldn't catch, then come back and take them one at a time.
- Three sentence-familiarity marks
- Notes attached to the exact sentence
- Marked-only view, so you drill what you missed
Shadowing
Say it. Hear yourself. Again.
Centum plays the original, gives you a turn to record, then plays your voice back. Use the waveforms as a visual reference and listen to compare.
- Original, your turn, playback — one continuous loop
- Recordings never leave the device
- Listen and repeat aloud with recording disabled
Progress
A hundred squares that mean something.
A square only fills when the playhead really passed through: 1.5× speed or slower, 90% of the film or more. There is no way to scrub one in — which is the entire point.
- Shaded by which stage you were in
- Listening with the screen off counts too
- Lock screen shows the lap count while you listen
Five stages, one film.
The method is 장동완's 100LS. Centum is the tool that makes getting through it survivable.
Watch it with no subtitles
Just enjoy it. You'll miss most of it, and that's the point.
Watch it in your own language
Now the story is yours. You stop guessing at plot and start hearing words.
Watch it with target-language subtitles
Sound snaps onto spelling. Mark every line you couldn't catch.
Go line by line
Loop, say it out loud, record, compare. Stay on a line until it's yours.
Then the rest of the hundred
Watch or listen to the familiar material again. Use audio-only practice when the picture is not needed, and keep opportunities to speak in your routine.
What you bring
Prepare your own local video and subtitle files. Centum does not include a catalogue of films or series.
A video file
MP4 or MOV on iPhone. Android also plays MKV, AVI, AC3 and DTS — it ships a full decoder, while iOS can only use what the system provides.
A subtitle file
.srt or .ass. One in the language you're learning, and optionally one in your own for stage two.
A film you actually love
You're going to watch it a hundred times. Everyday dialogue at natural speed works best.
Get the iPhone, iPad and Mac versions on the App Store. Download the signed Android APK directly from this website.
Your learning data stays on your device.
Your videos, subtitles, notes, recordings and progress stay on your device. Centum does not upload them. Android connects to this website for update checks and APK downloads you approve; connection details are explained in the privacy policy.